Construction Schedule Level 3
Level-iii addressed to : program and project managers, construction managers named as: project cordination schedule information: � maintained as a summarisation of the level iv schedule � for reporting status to senior management and to report monthly status to major clients. Control level schedule (level 3 schedule) posted on 6th november 2015 28th july 2018 by thepd a control level schedule (level 3 schedule or network schedule ) is an actual project schedule control and management tool for a work level.. Level-01 is the most basic schedule to get an overview of time span and important deliverables.(most of the clients are happy with level-01 schedule for tendering , so lets call it tender programme)---wbs level-02 is the extension of level-01 with more detailing clearly indicating the delivery of each work pack..
Normally, level 3 schedule represents the area of responsible manager such as engineering schedule by engineering manager, procurement by procurement manager and construction by construction manager. can be integrated into level 4 and level 5 schedule.. Level 3 is a good level for the overall project control schedule since it is neither too summarized nor too detailed. levels 4-x: the level of schedule subdivision continues to whatever is appropriate detail for the user.. Alfred - there are two ways to answer this question - from the point of microsoft project, and another from the point of wbs. from the point of microsoft project, level 1, level 2,, represents.
Comments
Post a Comment