Road Construction Shediac
More progress on the shediac new over pass july 20th 2016.. Drone video of the new highway 11-15 interchange in shediac nb.. Construction will begin between shediac and the saint gregoire area in 2014, south of bouctouche. this section will be twinned. between glenwood and miramichi, a two-lane bypass is proposed. work on route 11 will also include rehabilitating the existing highway from glenwood to saint gregoire..
Road construction in shediac, nb with reviews, maps, and contact information.. The town of shediac strives to support a high quality of life for its residents, workforce and visitors through sustainable development that carefully integrates economic, environmental and social/cultural interests.. Twin 2.1 kilometres and grade the new route 11 southbound lanes between route 134 and the shediac river. a new route 133 interchange will be constructed on the extension of the current route 133. as well modifications will be made to the route 134 northbound ramp, and the service road will be extended to route 133..
Comments
Post a Comment